Blog

Discover our latest articles and blogs

Shear Wall As-Built Changes: 3 Records Reviewers Expect
October 15, 2026

Shear Wall As-Built Changes: 3 Records Reviewers Expect

When a shear wall differs from approved plans, document site conditions, reassess capacity, and package photos linked to plans for plan check and inspection.

Calculation Cover Sheets: Two Filing Types, One Page Count Trap
October 14, 2026

Calculation Cover Sheets: Two Filing Types, One Page Count Trap

Find calculation cover sheet templates for engineering and land record filings, with page count checks, fee rules, and ShearWise Pro sample reports.

Shear Wall General Notes for Engineers: 2 Callouts Reviewers Check
October 13, 2026

Shear Wall General Notes for Engineers: 2 Callouts Reviewers Check

Write shear wall general notes aligned with SDPWS, IRC, and IBC. Get templates, two example callouts, and a reviewer checklist for engineers.

2026 Nevada Shear Wall Requirements: What Reviewers Check on Plans
October 12, 2026

2026 Nevada Shear Wall Requirements: What Reviewers Check on Plans

Check Nevada shear wall requirements against the 2024 IBC and IRC, ASCE 7 loads, and local amendments, then document required details on permit drawings.

IBC Collector Requirements for Engineers: Why Nominal Shear Fails
October 11, 2026

IBC Collector Requirements for Engineers: Why Nominal Shear Fails

Learn when the IBC requires collectors, how overstrength affects splices and connections, and what design professionals should document for permit review.

Permit Resubmittals: One Missing Sheet Can Restart Review for Engineers
October 10, 2026

Permit Resubmittals: One Missing Sheet Can Restart Review for Engineers

Prepare a complete permit resubmittal package with corrected plans, clear comment responses, and portal checks to avoid rejection and review delays.

Engineers: Keep Each Trade PDF Under 50 MB for Local Permit Review
October 9, 2026

Engineers: Keep Each Trade PDF Under 50 MB for Local Permit Review

Avoid rejected permit submissions. Follow local file-size examples, aim for 50 MB per trade, and use reviewer-focused PDF prep with ShearWise.

Close Shear Wall Review Comments Faster for Engineers with CRS and FTAO
October 8, 2026

Close Shear Wall Review Comments Faster for Engineers with CRS and FTAO

Permit ready checklist for engineers to close shear wall review comments. Include CRS entries, FTAO outputs, and highlighted calc screenshots.

Calculate Hold Down Forces: Segmented Shear Wall Method for Engineers
October 7, 2026

Calculate Hold Down Forces: Segmented Shear Wall Method for Engineers

Engineer focused, step by step workflow that turns wall geometry into hold down reactions using AWC and HUD worked examples. Tool ready inputs and...