Blog
Discover our latest articles and blogs

Tested Garage Shear Wall Methods and Permit Ready Reports for Engineers
Test backed, code aligned guidance for engineers and contractors on garage shear walls, covering APA and FEMA methods, anchorage details, and permit ready...

Permit Ready GWB Shear Walls: Code Limits and Engineers' Checklist
Code-anchored, practitioner guide for engineers: when tests allow crediting GWB, SDC E/F limits, a permit-ready numeric checklist, and ShearWise Pro workflow.

Avoid 1.2/1.4 Triggers: Torsional Irregularity Workflow for Wood
Wood-focused workflow to check torsional irregularity: compute per-story TIR, test rigid and semirigid diaphragms, avoid 1.2/1.4 triggers, and produce...

770 plf Shear Wall Schedule for Permit Ready Plans, Engineers' Checklist
Engineer-focused checklist for permit-ready shear wall schedules. Includes the 770 plf benchmark, anchorage specs, field labels, load-path checks, and PDF...

Engineers: Use the 2× Drift Rule for Flexible vs Rigid Diaphragm
Code-backed workflow for engineers to choose flexible or rigid diaphragms. Apply the 2× average story drift rule, watch span ratio ≈3, or run a...

Inspectors: Verify 3/8 Inch Edge Setback in Shear Wall Nailing
Practical field steps for inspectors to verify shear wall nailing: 3/8 inch edge setback, spacing, nail condition, photos, code checks.

Engineers: Nail Slip in Shear Walls, SDPWS Tests, 78% Capacity Gap
Engineers: link SDPWS deflection and errata to lab tests, nonlinear nail slip models, and a ShearWise Pro workflow to document drift checks.

Diaphragm Shear Transfer for Engineers: Vd and A604.6.1 Checklist
Code backed diaphragm shear transfer for engineers: Vd formulas, UpCodes A604.6.1 anchor rules, material detailing, and a design checklist.

6 Steps to Window Opening Shear Design for 1–2 Story Engineers
Code linked workflow for engineers to design window openings on 1–2 Story wood and masonry. Covers PSW, SSW, FTAO checks, WALL2D test evidence, and sizing...